by BOSLAN | Mar 11, 2022 | Projects of Boslan, Generation and Electric Networks, Industry and Energy
La Muela II (Valencia) Hydroelectric Power Plant, Europe’s largest pumped-storage plant (pumping and generation). Power upgrade of 850 MW, the hydroelectric complex reaching a power of 1,470 MW. Underground power plant. Penstock of 5.45 m in diameter and 880 m in...
by BOSLAN | Mar 10, 2022 | Projects of Boslan, Generation and Electric Networks, Industry and Energy
Central Nuclear de Cofrentes (Valencia). Potencia 1092 MW. Reactor de agua en ebullición BWR/6 Actividad – Centrales Nucleares Servicios desarrollados – Asistencia Técnica a operación y mantenimiento durante periodos de operación y recarga de la central....
by BOSLAN | Mar 10, 2022 | Projects of Boslan, Industry and Energy, Renewable Gas
8 Liquefied Natural Gas plants. Activity – LNG Satellite Plant Developed services – Basic and detailed engineering, works supervision and management, commissioning.
by BOSLAN | Mar 10, 2022 | Projects of Boslan, Industry and Energy, Renewable Gas
Gas Pipeline of 20″ diameter / 27 km at 45 bar / 13 valve positions design / design of 9 Regulation and Metering Stations AP45 – AP5 / over 300 km of antennas and distribution networks. Activity – Gasification Plan Developed servicess – Basic...
by BOSLAN | Mar 10, 2022 | Projects of Boslan, Industry and Energy, Renewable Gas
Over 10,000 km / 517 studies. Activity – Network Simulation Developed services – Distribution network dimensioning studies for analysis of their behaviour in new communities and expansions of existing networks.
by BOSLAN | Mar 10, 2022 | Projects of Boslan, Industry and Energy, Renewable Gas
Over 25,000 km throughout Spanish territory Activity – Distribution Network Developed services – Basic routing study, authorisation and construction project, works supervision and management....